Preliminary Design Study - 2022

HMFH Architects completed a Preliminary Design Study in August 2022.

  • The report was submitted to the Concord School District in three volumes over 400 pages

  • Due to the size of the files, each section is posted separately

  • The first file is the Table of Contents

  • Note: The report is labeled “DRAFT” – this is the final, submitted version of the report. The report was accepted by the Board of Education. A vote has not been taken by the Board to approve a design.

HMFH Final Report 2022 - 000 Table of Contents

HMFH Final Report 2022 - 001 Design Team & Acknowledgements

HMFH Final Report 2022 - Vol I Sec 1 Introduction & Executive Summary

HMFH Final Report 2022 - Vol I Sec 2 Visioning

HMFH Final Report 2022 - Vol I Sec 3 Grade Configuration

HMFH Final Report 2022 - Vol I Sec 4 Design Capacity

HMFH Final Report 2022 - Vol I Sec 5 Educational Program

HMFH Final Report 2022 - Vol I Sec 6 YMCA Partnership

HMFH Final Report 2022 - Vol I Sec 7 Sustainability

HMFH Final Report 2022 - Vol II Sec 8 Evaluation of Existing Conditions

HMFH Final Report 2022 - Vol II Sec 9 Site Development

HMFH Final Report 2022 - Vol III Sec 10 Site Development

HMFH Final Report 2022 - Vol III Sec 11 Basics of Design Reports

HMFH Final Report 2022 - Vol III Sec 12 Cost Estimate

HMFH Final Report 2022 - Vol III Sec 13 Local Actions & Approvals

Appendices – to be posted