Preliminary Design Study - 2022
Preliminary Design Study - 2022
HMFH Architects completed a Preliminary Design Study in August 2022.
-
The report was submitted to the Concord School District in three volumes over 400 pages
-
Due to the size of the files, each section is posted separately
-
The first file is the Table of Contents
-
Note: The report is labeled “DRAFT” – this is the final, submitted version of the report. The report was accepted by the Board of Education. A vote has not been taken by the Board to approve a design.
Appendices – to be posted
HMFH Final Report 2022 Vol II Sec 9 Site Development
pdf
HMFH Final Report 2022 Vol III Sec 10 Site Development
pdf
HMFH Final Report 2022 Vol III Sec 11 Basics of Design Reports
pdf
HMFH Final Report 2022 Vol III Sec 12 Cost Estimate
pdf
HMFH Final Report 2022 Vol III Sec 13 Local Actions Approvals
pdf