Preliminary Design Study - 2022
HMFH Architects completed a Preliminary Design Study in August 2022.
The report was submitted to the Concord School District in three volumes over 400 pages
Due to the size of the files, each section is posted separately
The first file is the Table of Contents
Note: The report is labeled “DRAFT” – this is the final, submitted version of the report. The report was accepted by the Board of Education. A vote has not been taken by the Board to approve a design.
HMFH Final Report 2022 - 000 Table of Contents
HMFH Final Report 2022 - 001 Design Team & Acknowledgements
HMFH Final Report 2022 - Vol I Sec 1 Introduction & Executive Summary
HMFH Final Report 2022 - Vol I Sec 2 Visioning
HMFH Final Report 2022 - Vol I Sec 3 Grade Configuration
HMFH Final Report 2022 - Vol I Sec 4 Design Capacity
HMFH Final Report 2022 - Vol I Sec 5 Educational Program
HMFH Final Report 2022 - Vol I Sec 6 YMCA Partnership
HMFH Final Report 2022 - Vol I Sec 7 Sustainability
HMFH Final Report 2022 - Vol II Sec 8 Evaluation of Existing Conditions
HMFH Final Report 2022 - Vol II Sec 9 Site Development
HMFH Final Report 2022 - Vol III Sec 10 Site Development
HMFH Final Report 2022 - Vol III Sec 11 Basics of Design Reports
HMFH Final Report 2022 - Vol III Sec 12 Cost Estimate
HMFH Final Report 2022 - Vol III Sec 13 Local Actions & Approvals
Appendices – to be posted