HMFH Architects completed a Preliminary Design Study in August 2022.
The report was submitted to the Concord School District in three volumes over 400 pages
Due to the size of the files, each section is posted separately
The first file is the Table of Contents
Note: The report is labeled “DRAFT” – this is the final, submitted version of the report. The report was accepted by the Board of Education. A vote has not been taken by the Board to approve a design.
Appendices – to be posted