Preliminary Design Study - 2022
Preliminary Design Study - 2022
HMFH Architects completed a Preliminary Design Study in August 2022.
-
The report was submitted to the Concord School District in three volumes over 400 pages
-
Due to the size of the files, each section is posted separately
-
The first file is the Table of Contents
-
Note: The report is labeled “DRAFT” – this is the final, submitted version of the report. The report was accepted by the Board of Education. A vote has not been taken by the Board to approve a design.
Appendices – to be posted
-
HMFH Final Report 2022 Vol II Sec 9 Site Developmentpdf
-
HMFH Final Report 2022 Vol III Sec 10 Site Developmentpdf
-
HMFH Final Report 2022 Vol III Sec 11 Basics of Design Reportspdf
-
HMFH Final Report 2022 Vol III Sec 12 Cost Estimatepdf
-
HMFH Final Report 2022 Vol III Sec 13 Local Actions Approvalspdf
